12. Change Management and Rollout

Goal

Provide low-risk patterns for introducing protocol/config/UI/backend changes in a running panel.

Safe rollout pattern

  1. Backup DB.
  2. Add new config in parallel (do not replace old path immediately).
  3. Validate with one test client.
  4. Migrate a small user slice.
  5. Monitor logs/latency/failure rate.
  6. Complete migration and decommission old path.

For inbound/protocol changes

Do first:

  • Naming cleanup and explicit role labels.
  • New test inbound with clear -test suffix.

Do later:

  • Security/transport rotations on production inbound.

For client policy changes

  • Apply policy in additive way.
  • Prefer staged updates by user segment.
  • Confirm no accidental disable due to quota/expiry mismatch.

For custom feature changes

  • Keep additive APIs; avoid breaking old endpoints.
  • Feature-flag or route-gate where possible.
  • Maintain backward compatibility with inbound-native operations.

Regression checklist

After any significant change verify:

  1. Login and panel navigation.
  2. Inbounds list and edit flow.
  3. Add/update/delete client flow.
  4. Export URL/subscription flow.
  5. Xray restart and log health.
  6. Custom clients page CRUD + sync.

Rollback checklist

  1. Stop rollout.
  2. Revert to known-good binary/config.
  3. Restore DB backup if data mutation is root cause.
  4. Re-validate panel and xray state.
  5. Reintroduce change in smaller scope.