# 12. Change Management and Rollout
|
|
|
|
## Goal
|
|
|
|
Provide low-risk patterns for introducing protocol/config/UI/backend changes in a running panel.
|
|
|
|
## Safe rollout pattern
|
|
|
|
1. Backup DB.
|
|
2. Add new config in parallel (do not replace old path immediately).
|
|
3. Validate with one test client.
|
|
4. Migrate a small user slice.
|
|
5. Monitor logs/latency/failure rate.
|
|
6. Complete migration and decommission old path.
|
|
|
|
## For inbound/protocol changes
|
|
|
|
Do first:
|
|
- Naming cleanup and explicit role labels.
|
|
- New test inbound with clear `-test` suffix.
|
|
|
|
Do later:
|
|
- Security/transport rotations on production inbound.
|
|
|
|
## For client policy changes
|
|
|
|
- Apply policy in additive way.
|
|
- Prefer staged updates by user segment.
|
|
- Confirm no accidental disable due to quota/expiry mismatch.
|
|
|
|
## For custom feature changes
|
|
|
|
- Keep additive APIs; avoid breaking old endpoints.
|
|
- Feature-flag or route-gate where possible.
|
|
- Maintain backward compatibility with inbound-native operations.
|
|
|
|
## Regression checklist
|
|
|
|
After any significant change verify:
|
|
1. Login and panel navigation.
|
|
2. Inbounds list and edit flow.
|
|
3. Add/update/delete client flow.
|
|
4. Export URL/subscription flow.
|
|
5. Xray restart and log health.
|
|
6. Custom clients page CRUD + sync.
|
|
|
|
## Rollback checklist
|
|
|
|
1. Stop rollout.
|
|
2. Revert to known-good binary/config.
|
|
3. Restore DB backup if data mutation is root cause.
|
|
4. Re-validate panel and xray state.
|
|
5. Reintroduce change in smaller scope.
|